Motoman Robot Arc Welding Material Separation Baskets for Heavy Equipment

Motoman HP50-20 extended-reach robot wall-mounted on a 10-m MotoRail track welds large material separator baskets fixtured on two headstock/tailstock positioners.

Summary

Robot system welds parts in 3.5-4 hours – more than 10 times faster than manual process, and more than 40% faster than customer’s requirement. Robot system improves productivity and efficiency, and provides flexibility to weld additional parts.

Project Challenges

Motoman Robotics Solution

Motoman Robotics provided a custom MotoRail™ solution, including:

Fixtures/Tooling Details

Motoman Robotics provided two sets of part holding fixtures: one set for each positioner. Fixture details are hardened. Individual parts are manually bolted to the fixtures using existing holes in the parts, and no sensors are required.